Command center
The current operating picture for the active shift.
- Approved goal, actual output, expected by now
- Projected end-of-shift output, labeled as an estimate
- Staffing, backlog, open alerts, and reading freshness
Goals, output, staffing, barriers, and handoffs, connected so every leader works from the same facts and the same timestamps.
The current operating picture for the active shift.
Configure recurring schedules once. The active shift is detected from the facility clock.
Department targets and actuals with configurable tolerance bands.
Advisory recommendations based on workload, qualifications, and coverage.
Equipment issues and process barriers with owners, time windows, and actions.
Closeout preserves what happened so the next shift starts informed.
Expected output is the approved goal × the share of productive time elapsed. The projection divides actual output by that share. Shift Command withholds a projection when too little time has passed or too few readings have arrived, and never treats a missing reading as zero.
Default tolerance: Green 0–4,000 units short · Orange 4,001–8,499 · Red 8,500+. Each facility can set its own. Green means within tolerance, not necessarily that the goal was met.
Walk through a synthetic shift, then talk through your data sources and a practical path to a trial.